KNIGHTS BRIDGE-COURT YARD 3

  • Mechanical Works Carried Out in the KNIGHTS BRIDGE-COURT YARD 3 Project

    The KNIGHTS BRIDGE-COURT YARD 3 project involved the installation of essential mechanical infrastructure by Merga Group, ensuring the building's core engineering systems were effectively established. The following works were professionally executed:

  • General Water Supply System:

    • High-quality piping and modern equipment were installed to ensure a steady water supply across all floors.
    • Special pump systems were set up to maintain clean and uninterrupted water flow.
  • Sewage Systems:

    • Comprehensive sewage systems were installed to cover all floors, safely managing wastewater disposal.
    • The system features modern isolation and purification mechanisms in line with the latest standards.
  • Ventilation Systems:

    • High-performance ventilation systems were installed to keep the indoor air fresh and clean throughout the building.
    • Individual control functions were provided in each room to maintain an optimal microclimate.
  • Fire Suppression Systems:

    • Automatic fire suppression systems were installed to respond quickly in the event of a fire.
    • With fire detectors and sprinkler heads, the system provides maximum safety for occupants.
  • These mechanical works in the KNIGHTS BRIDGE-COURT YARD 3 project ensure the building’s safety, sustainability, and comfort for its residents.