KNIGHTS BRIDGE-COURT YARD 3
-
Mechanical Works Carried Out in the KNIGHTS BRIDGE-COURT YARD 3 Project
The KNIGHTS BRIDGE-COURT YARD 3 project involved the installation of essential mechanical infrastructure by Merga Group, ensuring the building's core engineering systems were effectively established. The following works were professionally executed:
-
General Water Supply System:
- High-quality piping and modern equipment were installed to ensure a steady water supply across all floors.
- Special pump systems were set up to maintain clean and uninterrupted water flow.
-
Sewage Systems:
- Comprehensive sewage systems were installed to cover all floors, safely managing wastewater disposal.
- The system features modern isolation and purification mechanisms in line with the latest standards.
-
Ventilation Systems:
- High-performance ventilation systems were installed to keep the indoor air fresh and clean throughout the building.
- Individual control functions were provided in each room to maintain an optimal microclimate.
-
Fire Suppression Systems:
- Automatic fire suppression systems were installed to respond quickly in the event of a fire.
- With fire detectors and sprinkler heads, the system provides maximum safety for occupants.
-
These mechanical works in the KNIGHTS BRIDGE-COURT YARD 3 project ensure the building’s safety, sustainability, and comfort for its residents.