Biləcəri Locomotive Warehouse Project

  • Reference: Biləcəri Locomotive Warehouse Project

    This project involved the comprehensive installation and commissioning of electrical, security, infrastructure, and mechanical systems within the Biləcəri Locomotive Warehouse. The professional team at Merga Group carried out these tasks to the highest quality standards, ensuring a secure, energy-efficient, and durable infrastructure for the warehouse.

    Scope of Work:

  • Electrical Works:

    • General Electrical Supply: A reliable electrical supply system was installed to provide uninterrupted power throughout all areas of the warehouse. This system ensures efficient and safe distribution of electrical energy.
    • Lighting Systems: Modern lighting systems were installed for optimal and effective illumination of both the interior and exterior areas of the warehouse. The lighting system promotes energy efficiency and enhances workplace safety.
    • Generator System: A generator system was installed to support continuous energy supply during power outages, ensuring the continuity of operations.
    • UPS (Uninterruptible Power Supply) System: A UPS system was set up to provide uninterrupted power for sensitive equipment, protecting devices during power cuts and voltage drops.
    • Solar Panel and Inverter System: Solar panels and an inverter system were installed to provide an additional, eco-friendly energy source for the warehouse, reducing operational costs and environmental impact.
  • Security and Infrastructure:

    • Surveillance Camera System: A modern surveillance camera system was installed to enhance security, allowing remote monitoring of all areas within the warehouse.
    • Fire Alarm System: A fire alarm system was set up to provide timely warnings in the event of fire risk, ensuring the safety of both people and property.
    • Internal Internet Network Installation: A high-speed internal internet network was established to ensure seamless communication and data flow within the warehouse, optimizing workflow efficiency.
  • Mechanical Works:

    • Heating, Cooling, and Ventilation Systems: Systems were installed to maintain optimal temperature and humidity levels, providing a comfortable work environment while enhancing energy efficiency.
    • Firefighting System: A comprehensive firefighting system was set up to enhance fire safety, enabling quick response to contain fire incidents and minimize risks.
  • Overall Project Outcome:
    The Biləcəri Locomotive Warehouse Project created a modern, high-quality infrastructure that meets the safety, energy efficiency, and durability needs of the facility. Executed by Merga Group's experienced team, this project has established a reliable, long-term working environment that fully satisfies the requirements of the warehouse.