AZERBAIJAN CASPIAN SEAFARING ADMINISTRATIVE BUILDING

  • ASCO Project

    Within the scope of the ASCO Project, the following works have been carried out:

    Electrical Supply and Safety Systems:

  • General Electrical Supply: Modern infrastructure for electrical supply was established in line with current standards, ensuring stable and safe electricity provision for the facility.
  • Voltage Converter Devices: Various voltage converters were installed to enhance energy efficiency and system sustainability. These devices maintain voltage at the required level, enabling efficient and sustainable operation of electrical systems.
  • UPS (Uninterruptible Power Supply) Systems: UPS systems were installed to provide uninterrupted power in cases of power outage or other emergencies. These systems ensure continuity of power supply and minimize potential risks.
  • Fire Alarm Systems: Advanced fire alarm systems based on modern technology were installed as part of safety measures. These systems detect fire risks at an early stage, ensuring the safety of the facility.
  • Lighting Systems:

  • Facade Lighting: Special facade lighting systems were implemented to create an aesthetic and attractive appearance for the building. This lighting ensures the building is visible and eye-catching at night.
  • Standard Lighting: High-quality, energy-efficient lighting systems were installed throughout the facility, enhancing the comfort of the working environment and optimizing energy consumption.
  • Other Works:

  • Internal Infrastructure Enhancement: In addition to electrical and safety systems, the durability and functionality of the internal infrastructure were ensured.
  • These works carried out in the ASCO Project were completed with Merga Group’s professional approach and adherence to high-quality standards. Each of these works serves to enhance the facility’s safety, durability, and energy efficiency.