AZERBAIJAN CASPIAN SEAFARING ADMINISTRATIVE BUILDING
-
ASCO Project
Within the scope of the ASCO Project, the following works have been carried out:
Electrical Supply and Safety Systems:
- General Electrical Supply: Modern infrastructure for electrical supply was established in line with current standards, ensuring stable and safe electricity provision for the facility.
- Voltage Converter Devices: Various voltage converters were installed to enhance energy efficiency and system sustainability. These devices maintain voltage at the required level, enabling efficient and sustainable operation of electrical systems.
- UPS (Uninterruptible Power Supply) Systems: UPS systems were installed to provide uninterrupted power in cases of power outage or other emergencies. These systems ensure continuity of power supply and minimize potential risks.
- Fire Alarm Systems: Advanced fire alarm systems based on modern technology were installed as part of safety measures. These systems detect fire risks at an early stage, ensuring the safety of the facility.
-
Lighting Systems:
- Facade Lighting: Special facade lighting systems were implemented to create an aesthetic and attractive appearance for the building. This lighting ensures the building is visible and eye-catching at night.
- Standard Lighting: High-quality, energy-efficient lighting systems were installed throughout the facility, enhancing the comfort of the working environment and optimizing energy consumption.
-
Other Works:
- Internal Infrastructure Enhancement: In addition to electrical and safety systems, the durability and functionality of the internal infrastructure were ensured.
-
These works carried out in the ASCO Project were completed with Merga Group’s professional approach and adherence to high-quality standards. Each of these works serves to enhance the facility’s safety, durability, and energy efficiency.