DƏB Terminal Building

  • Project Name: DƏB Terminal Building

    Project Description:
    Comprehensive electrical, low-voltage, and mechanical system installation and commissioning were carried out in the DƏB Terminal Building. Each system was designed and implemented with a focus on functionality and safety, using modern technologies and international standards.

    Scope of Work:

  • Electrical Works:

    • Lighting System: High-quality and energy-efficient lighting systems were installed in both interior and exterior areas of the terminal. These systems ensure optimal illumination throughout the building and enhance aesthetic appeal.
    • Electrical Panels: Electrical distribution panels were installed to regulate power supply and provide safe management in compliance with safety standards.
    • Generator and UPS Systems: Generator and UPS systems were set up to ensure uninterrupted power supply. These systems automatically activate in case of power failure, ensuring continuity of energy.
    • Low-Voltage Systems:
      • Surveillance Cameras: Surveillance cameras were installed in all critical areas of the terminal to ensure security. This system provides remote monitoring and control.
      • Fire Alarm Systems: High-sensitivity fire alarm systems were installed to enhance fire safety within the building. These systems provide visual and audible alerts in case of emergency.
      • Access Control Systems: Authorized access control systems were installed to monitor and control entry to the building, allowing access only to authorized personnel.
      • Acoustic Sound Systems: Acoustic sound systems were installed for effective broadcasting of announcements and notifications within the terminal.
      • Internal Internet Network: An internal internet network was set up to ensure continuous information flow and communication throughout the building.
  • Mechanical Works:

    • Ventilation Systems: Modern ventilation systems were installed to ensure optimal air circulation in every area of the terminal. These systems regulate temperature and humidity levels.
    • General Plumbing Works: Comprehensive plumbing installation was carried out to ensure efficient water supply and drainage systems in all areas of the terminal.
    • Heating Systems: Efficient heating systems were installed to meet the heating needs of the building during winter, providing an energy-efficient and comfortable environment.
  • Overall Project Summary:
    Each system installed in the DƏB Terminal Building project was designed and implemented in accordance with modern technologies and international standards. The terminal’s security, comfort, and energy efficiency were prioritized, and all systems were professionally installed to operate in a long-lasting and sustainable manner.