ALAT FREE ECONOMIC ZONE PHASE-1
-
Alat Free Economic Zone Project
Within the scope of the Alat Free Economic Zone project, the installation of high-voltage electrical cables and the overall lighting of the area were carried out professionally. The project was implemented by Merga Group’s specialists to ensure a safe and reliable energy supply and effective lighting for the expansive area of the economic zone.
High-Voltage Electrical Cable Installation:
- Powerful and Stable Energy Supply: A high-voltage electrical infrastructure was established to meet the energy demands of the economic zone. Through high-voltage cables, the necessary electricity is provided to industrial and commercial facilities within the area in a stable and uninterrupted manner.
- Use of Quality Materials: High-quality cables and installation equipment that meet the highest standards were used in the installation process, ensuring the system's longevity and safety.
- Professional Installation and Advanced Technologies: Advanced technologies were utilized in the installation of high-voltage cables, optimizing energy distribution and minimizing risks.
- Safety and Control: Safety is crucial in high-voltage systems. Therefore, strict adherence to safety protocols was maintained throughout the cable installation, with special insulation and monitoring measures to ensure cable protection.
-
General Area Lighting:
- Comprehensive Lighting Solutions: High-efficiency lighting systems were installed to illuminate various areas within the zone, ensuring clarity and functionality across the workspace.
- Energy-Efficient Lighting Equipment: Lighting equipment selected for this project focuses on energy efficiency, using LED technology to reduce energy consumption while offering durable, low-maintenance solutions.
- Aesthetic and Functional Design: The lighting systems were designed to achieve optimal aesthetic and functional outcomes, making the economic zone safer and more functional at night.
- Safety and Visibility: Area-wide lighting enhances the safety of employees and visitors within the zone, ensuring that every corner is well-lit and potential hazards are minimized.
-
These efforts are aimed at creating a sustainable, safe, and efficient energy and lighting infrastructure within the Alat Free Economic Zone. This project, completed by Merga Group’s professional team, meets high-quality standards, providing comprehensive energy and lighting solutions for the zone’s future operations.