Nobel Plaza
Works Implemented by Merga Group for Nobel Plaza
Merga Group has fully implemented the energy, lighting, telecommunication, and security systems for the Nobel Plaza project. The primary goal of this project is to establish a modern and durable electrical infrastructure for the building while ensuring a secure and comfortable environment for work and living. Each system has been installed using high-quality equipment and advanced technologies to meet the highest standards of safety and efficiency.
Scope of Work and Installed Equipment:
-
Voltage Conversion Equipment:
- Transformers: Transformers were installed to convert high voltage to medium voltage, ensuring stable energy distribution and the safe operation of equipment.
- Medium Voltage Converters: Converters were installed to transform medium voltage to standard voltage levels (220V and 380V). These converters enable efficient power distribution across the building and help optimize energy costs.
-
Backup Power Supply:
- Generators: In the event of a power outage, generators automatically provide uninterrupted power to maintain critical operations and ensure safety within the facility.
- UPS (Uninterruptible Power Supply) Systems: UPS systems were installed to provide backup power for critical equipment during power outages. These systems prevent equipment damage and minimize data loss during electrical interruptions.
-
Lighting Systems:
- LED Lighting Fixtures: Energy-efficient LED lighting was installed throughout the building's interior and exterior areas. LED lighting offers long lifespan, low energy consumption, and environmentally friendly solutions.
- Automatic Lighting Controllers: Automatic lighting control systems were installed to adjust illumination levels based on the time of day and ambient light. These controllers reduce energy usage, improve efficiency, and create a comfortable work environment.
-
Telecommunication and Internet Systems:
- GPON (Gigabit Passive Optical Network) System: A GPON system was installed to provide high-speed internet connectivity through fiber optic networks. This system ensures stable and high-speed internet, facilitating seamless communication and data transfer within the building.
- Internal Network Equipment: Internal network devices were installed to support efficient and continuous telecommunication infrastructure, with modern technology used to ensure secure data flow.
-
Security and Surveillance Systems:
- Fire Alarm Systems: Advanced fire alarm systems were installed to enhance the building’s safety. These systems provide both audible and visual warnings in case of fire, enabling timely evacuation.
- Surveillance Cameras: High-quality surveillance cameras were installed to ensure security control throughout Nobel Plaza, allowing remote monitoring of all areas.
- Automatic Barrier and Access Control Systems: Automatic barriers and access control systems were installed to regulate secure entry and exit to the building. Only authorized personnel can access the premises, enhancing overall security.
- Intercom System: An intercom system was installed for guest management and security purposes, facilitating controlled access and communication within the building.
Project Summary: Merga Group has implemented Nobel Plaza’s electrical and security infrastructure to the highest standards. Each system installed meets modern demands for safety, comfort, and energy efficiency. Through the energy, lighting, and security systems established in this project, Nobel Plaza has become a stable, reliable, and technologically advanced working environment. This project, executed by Merga Group’s professional team, was completed with high standards of quality and reliability.